Skip to content

The Solarix site is still in development. Some features, pages and content are missing or unfinished.

The turbine hall at Solarix Nuclear Station, with a turbine in the foreground and the Solarix mark on the far wall

Roadmap

The development status of Solarix and the work planned next. Completed items are in the current development build; all other items are subject to change.

Build v0.2.0 - Synced November 26, 2026

  • In progress 11
  • Planned 1
  • Blocked 0
  1. PH-01

    In progress

    Simulation

    The core physics simulation each unit uses.

    • Feedwater & Coolant

      2 of 3 completed

      • Feedwater Pumps

        Completed
      • Feedwater Preheating

        Completed
      • Feedwater Aux

    • Thermal & Control

      Completed
    • Steam & Condensation

      Completed
  2. PH-02

    In progress

    Reactor Assets

    • Control

      2 of 4 completed

      • Switches

        Completed
      • Indicators

        Completed
      • Monitors

      • Panels & Desks

    • Containment

      2 of 4 completed

      • Pressure Vessel

        Completed
      • Drywall & Wetwell

        Completed
      • Fuel & Service Pools

      • Shield Plugs

  3. PH-03

    In progress

    Turbine Assets

    • Steam Turbine

      0 of 3 completed

      • High Pressure Turbine

      • Low Pressure Turbines

      • Turbine Generator

    • Turbine Auxiliaries

      0 of 2 completed

      • Aux & Emergency Oil Pumps

      • Valves & Pipes

  4. PH-04

    In progress

    Plant Construction

    The construction of each reactor unit, its turbine hall, containment, and control room.

    • Unit 2

      1 of 4 completed

      • Control Room

      • Turbine Hall

        Completed
      • Containment

      • Refuelling Floor

    • Unit 3

      1 of 4 completed

      • Control Room

      • Turbine Hall

        Completed
      • Containment

      • Refuelling Floor

        Planned
    • Unit 4

      0 of 4 completed

      • Control Room

        Planned
      • Turbine Hall

        Planned
      • Containment

        Planned
      • Refuelling Floor

        Planned
    • Unit 1

      Completed
  5. PH-05

    In progress

    Site Construction

    The construction of the entire facility.

    • Zone White

      0 of 5 completed

      • Central Park

      • Admin Building

      • Safety Complex

      • Residential Complex

        Planned
      • Presentation Centre

    • Zone Blue

      0 of 5 completed

      • Main Control Rooms

      • Safety Office

      • Checkpoint & Reception

      • Demonstration Centre

        Planned
      • Training Centre

        Planned
    • Zone Red

      0 of 1 completed

      • Emergency Diesels

    • Zone Purple

      Planned

      0 of 3 completed

      • Research Labs

      • Cryogenics

      • Drilling